CONTACT

Underground Hole
Survey Service.

WA’s market leader in underground hole surveying.

7 Years | 42 Underground Mines | 650,000+ Metres Surveyed

1,000m / shiftAVERAGE SURVEY RATE OF PREPARED HOLES
IT / EWPNO IT OR EWP REQUIRED
2,342METRES SURVEYED IN A SINGLE SHIFT — THE RECORD

Sites we
survey.

42 underground mines across Western Australia: the Pilbara, the Murchison, the Goldfields.

IBT underground-spec survey ute parked in a drive with survey equipment on board

Complete
survey service.

Fully inducted crews, underground-spec vehicles and all survey equipment supplied.

Up to 1,000 metres surveyed per day.

IBT surveyor picking up collars with a total station in an underground drive

No IT or work basket
required.

Up-holes surveyed directly from ground level. Collars picked up with total station.

Less site support. Faster surveying. Minimal disruption to operations.

Full hole survey
QAQC.

We survey the holes, analyse the results and deliver the reports.

Complete Hole Survey Reports provided at the end of every campaign.

Surveyor Portal metrics and reporting view: error distribution, performance over time and per-driller breakdown

Feedback that improves
drilling outcomes.

Our survey data has shown that actively responding to results and providing drillers with regular feedback leads to measurable improvements in drilling performance.

IBT Hole Survey Reports provide the information needed to identify trends, address recurring errors and give crews practical feedback while drilling is ongoing. The result:

  • Improved drilling accuracy
  • Better stope performance
  • Fewer bridges
  • Reduced remedial drilling, blasting and rework

Book your next
survey campaign.

Talk to the team about scheduling, scope and what a full survey campaign delivers on site.

Contact Us
IBT survey ute LV 002 in an underground drive, a loader's lights further down